Trades & construction · BC & Alberta

Trades and construction bookkeeping in BC and Alberta

Trades and construction bookkeeping in BC and Alberta relies on tracking costs and progress billings by job, recording holdbacks in dedicated asset and liability accounts, and following CRA GST timing rules for progress payments and holdbacks. Keeping BC PST on materials, subcontractor records for T5018 slips and vehicle logs organised protects cash flow.

Finvo Time JournalUpdated Written by the team at Finvo Partners Ltd.8 min read

Rated 5.0 on Google · 92 reviews

Key points

  • Track profit job by job: tag materials, full crew labour burden, subcontractors, permits and rentals to every active project so overrun jobs show up early.
  • Separate holdbacks from regular receivables and payables: use Holdback Receivable and Holdback Payable accounts so 10% statutory retentions are never lost or written off by mistake.
  • Follow CRA construction GST timing: progress billings generally trigger GST on the earlier of payment or due date, while statutory or written-contract holdbacks trigger GST on the earlier of payment or expiry of the holdback period.
  • Know BC PST vs Alberta rules: BC real property contractors generally pay 7% PST on installed materials as a job cost rather than charging it to clients; Alberta has no PST.
  • Gather subcontractor details up front: record legal names, addresses, Business Numbers and WCB clearance letters before releasing payment to keep T5018 reporting clean.

Why construction books behave differently from ordinary small businesses

A retail shop buys stock and sells it the same month. A home builder in Nanaimo, a renovation contractor in Surrey or a mechanical trade in Edmonton buys lumber, wire or pipe weeks before the next progress draw, pays crews every two weeks, waits 55 days or more for a 10% holdback, and runs three or four jobs at once.

When all revenue and supplier bills go into generic accounts without job tracking, the profit and loss statement looks profitable in months when a big deposit arrives and deeply negative in months when material bills hit. Clean construction bookkeeping ties every bill, draw and holdback to the project it belongs to. For a full list of allowable contractor tax claims, see our separate guide on tax deductions tradespeople often overlook; this guide focuses on how to run the books themselves.

Setting up job-by-job costing in your accounting software

Job costing is simply tagging every direct project transaction with a job or project code in your accounting software. It does not require complex enterprise tools, only consistent coding on every invoice, supplier bill and pay run:

  • Direct materials: supplier invoices for lumber, concrete, fixtures, piping and consumables tied to a specific site, entered net of recoverable GST. In BC, any non-recoverable 7% PST paid on supply-and-install materials belongs inside the material cost of that job.
  • Direct labour and labour burden: crew hours coded to each job, including not just hourly wages but also vacation pay, employer CPP, employer EI and WorkSafeBC or WCB-Alberta premiums.
  • Subcontractors: framing, electrical, plumbing, drywall or excavation invoices tagged to the project, with any holdback you retain tracked separately.
  • Job-specific overhead: equipment rentals, site bins, dump fees, permits, inspections and delivery charges tied directly to the contract.
  • Company overhead (not tagged to one job): shop rent, general liability insurance, office software, accounting fees and general vehicle costs stay in overhead so you can see true gross margin per job before overhead.

Comparing actual costs to date against your original quote and approved change orders each month shows whether a project is drifting before the final draw is billed.

Progress billings, holdback receivable and holdback payable

Progress billing splits a larger contract into staged invoices tied to milestones or percentage of completion. Alongside those draws, provincial lien legislation in both BC (under the Builders Lien Act) and Alberta (under the Prompt Payment and Construction Lien Act) generally requires a 10% holdback on construction contracts.

In the ledger, holdbacks are neither a discount nor a bad debt. They are earned amounts waiting for the statutory holdback period to expire. Recording them cleanly requires dedicated balance-sheet accounts:

How construction billings, holdbacks and taxes map in the books
TransactionBalance-sheet or income accountBookkeeping and tax note
Progress invoice (before holdback)Construction Revenue, Accounts Receivable and GST/HST PayableUnder CRA rules, GST on a progress payment is generally payable on the earlier of the day paid and the day due
10% holdback retained by your clientHoldback Receivable (separate current asset account, tracked by job)Keeps the retained 10% visible until release and separates it from overdue invoices
GST on a statutory or written-contract holdbackDeferred GST on Holdbacks (until triggered) moving to GST/HST PayableBecomes payable on the earlier of the day the holdback is paid and the day the holdback period expires
10% holdback you retain from a subcontractorHoldback Payable (separate current liability account, tracked by job and sub)Records the full subcontractor job cost now while showing the exact amount held until release
Customer deposit received before work startsCustomer Deposits / Unearned Revenue (liability account)Moves into revenue as work is billed; never treat an unearned deposit as finished-job profit

In BC, where a certificate of completion is issued under the Builders Lien Act, the holdback period ends 55 days after it. In Alberta, the Prompt Payment and Construction Lien Act sets a 10% holdback alongside prompt-payment timelines (28 days for owners after a proper invoice, and 7 days for contractors to pay subcontractors after being paid). Lien filings, certificates of completion and contract terms are legal matters: this guide is general information, not legal advice, and we work alongside your lawyer whenever lien or contract questions arise.

CRA holdback GST timing and BC PST vs Alberta rules

Two sales-tax rules trip up trades bookkeepers more than anything else:

  • CRA GST/HST timing on progress draws, substantial completion and holdbacks: according to CRA Guide RC4052 and CRA's home construction GST/HST guidance, GST/HST on a progress payment is generally payable on the earlier of the day it is paid and the day it becomes due. Where a written construction contract is substantially complete (90% or more) and payment has not yet been made or come due, GST on the unpaid portion generally becomes payable by the end of the following month. However, where a holdback is required under federal or provincial law or a written construction agreement, GST/HST on that holdback amount is deferred until the earlier of the day the holdback is paid and the day the holdback period expires.
  • BC PST for real property contractors (Nanaimo, Courtenay, Surrey and across BC): under Government of BC rules, contractors who supply and install materials that become part of real property (such as framing lumber, drywall, wiring, plumbing or built-in cabinets) are treated as the end consumer of those materials. You generally pay 7% BC PST when you buy the materials, include that PST inside your job material cost, and do not charge PST to your client (unless a written exception applies or you also sell uninstalled goods at retail). See BC PST registration and recording GST/HST and BC PST in your books.
  • Alberta contractors (Edmonton and across Alberta): Alberta has no provincial sales tax. Local Alberta construction work carries 5% GST only, simplifying material bill entry while still following federal CRA progress-billing and holdback timing rules.
Example

A Surrey renovation builder bills a $40,000 progress draw on a written residential contract with a 10% statutory holdback ($4,000). The current payable portion is $36,000 plus 5% GST ($1,800), for $37,800 due now. In the books, the $4,000 holdback sits in Holdback Receivable tied to that job, and the $200 GST on the holdback is tracked separately until the earlier of the day the client releases the $4,000 or the day the 55-day BC holdback period expires. Meanwhile, the 7% BC PST the builder paid at the lumber yard is coded straight into the job's Materials account alongside the lumber cost, while the 5% GST paid on that lumber goes into GST Input Tax Credits.

Subcontractors, T5018 slips and clearance letters

If more than 50% of your business income comes from construction activities, the CRA requires a T5018 Statement of Contract Payments for every Canadian-resident subcontractor you paid more than $500 for construction services during your chosen reporting period (calendar year or fiscal year, excluding GST/HST). The return is due six months after the end of that reporting period, and more than five slips must be filed electronically.

Clean bookkeeping prevents a year-end scramble for missing vendor numbers:

  1. Onboard every sub before the first cheque: collect legal name, trading name, address, Business Number (or SIN if unincorporated without a BN) and GST/HST registration number, and enter them into your vendor profile immediately.
  2. Flag subcontractor vendors in your accounting software: mark each construction trade vendor for T5018 tracking so year-end totals pull straight from the ledger (keeping material-only suppliers separate from construction service subcontractors).
  3. Save clearance letters with the job folder: pull a WorkSafeBC or WCB-Alberta clearance letter before work begins and again before releasing the final payment or holdback so you are not exposed to an unpaid subcontractor's premiums.
  4. Check worker status early: if a helper works exclusively on your schedule with your tools and takes no financial risk, CRA or WCB may view them as an employee requiring payroll rather than a subcontractor.

Keeping vehicle, fuel, tool and material coding clean

Trades owners often swipe one card at a building supply store, a gas station and a tool retailer on the same morning. Leaving those charges uncoded until year end blurs job profit and weakens CRA support:

  • Separate job materials from shop supplies and tools: lumber for the Oak Street build goes to Job Materials; a $350 drill or saw blade pack goes to Small Tools (under $500) or Equipment ($500 or more for capital cost allowance), not into a customer's lumber line.
  • Keep vehicle running costs in dedicated accounts: code fuel, maintenance, insurance and lease or loan payments to Vehicle Expenses, and keep a current mileage logbook showing business versus total kilometres.
  • Capture faded thermal receipts weekly: wholesale counter slips and fuel receipts fade fast in a truck console. Photographing receipts into your monthly digital folder protects both job costing and CRA six-year record-keeping rules, and tying every card statement off through a monthly bank reconciliation catches missing bills before the job closes.

Want to test where your current setup has gaps? Try our quick 5-question contractor tax checkup, or read ten tax deductions tradespeople often overlook for CCA classes, vehicle caps and meals rules.

How Finvo helps

We keep monthly bookkeeping by job, track progress billings and holdbacks, prepare GST/HST and BC PST returns, run crew payroll with WorkSafeBC or WCB-Alberta reporting, and prepare T5018 slips on the agreed schedule once your records are in. See our trades and construction accounting page for everything we cover. Your price depends on how your business runs. We confirm it after a free call, before any work starts. Pricing is explained on the business membership page. Meet with us online or by appointment at our Surrey, Edmonton or Courtenay offices, serving Nanaimo, Vancouver Island and both provinces.

This guide is general information for trades and construction businesses in BC and Alberta, checked against official CRA, Government of BC and Government of Alberta pages on 27 Nov 2026. Lien periods, contract terms and worker status involve legal questions; this is not legal or tax advice, and we work alongside your lawyer where needed.

Questions

Trades bookkeeping, answered

Why should a contractor track income and costs by job instead of in one lump sum?

A single company-wide profit and loss statement hides which projects actually earned a margin and which ones ran over budget. Coding labour burden, materials, subcontractors, permits and equipment rentals to each job lets you compare actual costs to your estimate while work is still open.

How should construction holdbacks be recorded in the books?

Record a holdback withheld by your customer in a separate Holdback Receivable asset account rather than writing off the unpaid portion or leaving it mixed inside overdue trade receivables. Record a holdback you retain from a subcontractor in a Holdback Payable liability account until it is released.

When does GST become payable on a construction holdback?

Under CRA construction rules, where a holdback is required by federal or provincial law or by a written construction agreement, GST/HST on the holdback portion generally becomes payable on the earlier of the day the holdback is paid and the day the holdback period expires. Progress payments without holdback follow the earlier of payment or due date.

Do BC contractors charge 7% PST to customers on supply-and-install jobs?

Generally no. Under Government of BC rules for real property contractors, contractors who supply and affix materials that become part of a building or land pay 7% PST when they buy the materials and build that cost into the contract price rather than charging PST to the customer, unless a written exception applies. Alberta has no PST.

What subcontractor records should be collected before issuing the first cheque?

Collect each subcontractor's full legal name, business name, mailing address, CRA Business Number (or Social Insurance Number for an individual) and GST/HST number if registered, plus a current WorkSafeBC or WCB-Alberta clearance letter. Having these on file from day one makes T5018 reporting straightforward.

How does Finvo price monthly bookkeeping for a trades or construction business?

Your price depends on how your business runs, including active jobs, subcontractors, payroll, GST and BC PST activity. We confirm it after a free call, before any work starts. Pricing is explained on the business membership page.

Sources, checked 27 Nov 2026. Rules have exceptions and can change. This page is general information, not legal or tax advice for your situation.

Free 15-minute call

Want job numbers that match what is happening on site?

Book a free 15-minute call by video, phone or by appointment in Surrey, Edmonton or Courtenay. Tell us what trade you run, how you bill jobs and how many subcontractors or crew you pay, and we will confirm what we would do and what it would cost before any work starts.

Book a free 15-minute call

15-minute calls on weekdays, 9 to 11 am and 1 to 4 pm Pacific (10 am to 12 pm and 2 to 5 pm Mountain), except holidays.

Open times vary from day to day; the next call is usually within 1 to 2 business days. The calendar shows what is open when you book.

Tell us your preferred office on the call. The calendar shows the times in your own time zone.

Free 15-minute callVideo or phoneIn person in Surrey, Edmonton and Courtenay

Call (236) 300-3322Email contact@finvo.caMon–Fri, 9 am – 5 pm PT/MT5.0 on Google · 92 reviews